How to Use the Dashboard: Use the dropdowns on the left or the "Selection" tool on the map to filter the dashboard. Each blue icon on the map can be clicked on to view information for that Building Permit.
Active Building Permit: An authorization to proceed with the construction or reconfiguration of a specific structure at a particular site, in accordance with the approved drawings and specifications. The term “active” simply means the building permit has been issued, but the project has not yet been completed or “finaled” by a building inspector.