ArcGIS REST Services Directory Login | Get Token
JSON

Legend (GeneralMapLayers)

Evacuation Status Boundaries (297)
Residential Pier Permits (0)
Residential Pier Permit Residential Pier Permit
Residential Pier Rental Residential Pier Rental
Residential Shared Pier Permit Residential Shared Pier Permit
Commercial Pier Permits (1)
Daily Rental Boats Daily Rental Boats
Sportfishing Charters Sportfishing Charters
Standard Marina Rate Standard Marina Rate
Fuel Dock Rate Fuel Dock Rate
Guest/Instructional Rate Guest/Instructional Rate
Shipyard Rate Shipyard Rate
County Tidelands County Tidelands
Charter Charter
Building over Tidelands Building over Tidelands
HOA Piers HOA Piers
To be Determined (TBD) To be Determined (TBD)
Area Outside of Lease Area Outside of Lease
City Property City Property
Private Tidelands Private Tidelands
Leased Area Leased Area
Public Access Public Access
Vessel Rental Vessel Rental
Restaurant Guest Slip Restaurant Guest Slip
Bulkhead/Pierhead Lines (2)
Applicant Dredging Area - Cuurent Year (3)
Applicant Dredging Area - Other Years (4)
RGP 54 Sediment Characterization (5)
Suitable to -10 feet MLLW plus 2 feet of overdepth for unrestricted disposal at the LA-3 ODMDS. Grain size required prior to beach replenishment or nearshore placement to demonstrate suitability. Suitable to -10 feet MLLW plus 2 feet of overdepth for unrestricted disposal at the LA-3 ODMDS. Grain size required prior to beach replenishment or nearshore placement to demonstrate suitability.
Suitable to -10 feet MLLW plus 2 feet of overdepth for unrestricted disposal at the LA-3 ODMDS. Material proposed for beach replenishment or nearshore placement must have grain size verification and chemical testing for DDTs with agency concurrence to verify suitability prior to placement. Z-layer testing is required to confirm post-dredge surface contains DDT concentrations less than 18.0 ppb*. Suitable to -10 feet MLLW plus 2 feet of overdepth for unrestricted disposal at the LA-3 ODMDS. Material proposed for beach replenishment or nearshore placement must have grain size verification and chemical testing for DDTs with agency concurrence to verify suitability prior to placement. Z-layer testing is required to confirm post-dredge surface contains DDT concentrations less than 18.0 ppb*.
Material to -7 feet MLLW plus 1 foot of overdepth proposed for disposal at LA-3 ODMDS must have chemical testing for mercury with agency concurrence to verify suitability prior to disposal. Z-layer testing is required to confirm post-dredge surface contains mercury less than 1 ppm prior to dredging to demonstrate newly exposed surface is clean. Material proposed for beach replenishment or nearshore placement must also have grain size verification prior to placement. Material to -7 feet MLLW plus 1 foot of overdepth proposed for disposal at LA-3 ODMDS must have chemical testing for mercury with agency concurrence to verify suitability prior to disposal. Z-layer testing is required to confirm post-dredge surface contains mercury less than 1 ppm prior to dredging to demonstrate newly exposed surface is clean. Material proposed for beach replenishment or nearshore placement must also have grain size verification prior to placement.
Area not included under RGP 54. Area not included under RGP 54.
Material proposed for disposal at LA-3 ODMDS must have chemical testing for mercury with agency concurrence to verify suitability prior to disposal. Z-layer testing is required to confirm post-dredge surface contains mercury less than 1 ppm prior to dredging to demonstrate newly exposed surface is clean. Material proposed for beach replenishment or nearshore placement must also have grain size verification prior to placement. Material proposed for disposal at LA-3 ODMDS must have chemical testing for mercury with agency concurrence to verify suitability prior to disposal. Z-layer testing is required to confirm post-dredge surface contains mercury less than 1 ppm prior to dredging to demonstrate newly exposed surface is clean. Material proposed for beach replenishment or nearshore placement must also have grain size verification prior to placement.
Material proposed for disposal at LA-3 ODMDS must have chemical testing for mercury and PCBs with agency concurrence to verify suitability prior to disposal. Z-layer testing is required to confirm post-dredge surface contains mercury less than 1 ppm and PCBs less than 100 ppb prior to dredging to demonstrate newly exposed surface is clean. Material proposed for beach replenishment or nearshore placement must also have grain size verification prior to placement. Material proposed for disposal at LA-3 ODMDS must have chemical testing for mercury and PCBs with agency concurrence to verify suitability prior to disposal. Z-layer testing is required to confirm post-dredge surface contains mercury less than 1 ppm and PCBs less than 100 ppb prior to dredging to demonstrate newly exposed surface is clean. Material proposed for beach replenishment or nearshore placement must also have grain size verification prior to placement.
Suitable to -15 feet MLLW plus 2 feet of overdepth for unrestricted disposal at the LA-3 ODMDS. Material proposed for beach replenishment or nearshore placement must have grain size verification and chemical testing for DDTs with agency concurrence to verify suitability prior to placement. Z-layer testing is required to confirm post-dredge surface contains DDT concentrations less than 18.0 ppb*. Suitable to -15 feet MLLW plus 2 feet of overdepth for unrestricted disposal at the LA-3 ODMDS. Material proposed for beach replenishment or nearshore placement must have grain size verification and chemical testing for DDTs with agency concurrence to verify suitability prior to placement. Z-layer testing is required to confirm post-dredge surface contains DDT concentrations less than 18.0 ppb*.
<all other values> <all other values>
RGP 54 Plan Area (6)
Eelgrass Zones (7)
Stable Eelgrass Zone Stable Eelgrass Zone
Transitional Eelgrass Zone Transitional Eelgrass Zone
Unvegetated Eelgrass Zone Unvegetated Eelgrass Zone
Project Line (8)
Navigation Channel (9)
Mooring Sites (10)
Eelgrass Beds 2024 (296)
FEMA Labels (14)
FEMA Accepted Map Layer (Flood Zones) (15)
A A
AE AE
AH AH
AO-1 AO-1
AO-2 AO-2
D D
VE VE
X X
Type 1 (16)
Type 2 (17)
Type 3 (18)
Type A (19)
Type B (20)
Convalescent Home (21)
Pay Stations (22)
EV Charging Stations (23)
Level 2 - Single Port Level 2 - Single Port
Level 2 - Dual Port Level 2 - Dual Port
Level 3 DC - Dual Port Level 3 DC - Dual Port
Paid Parking Lot (24)
Blue Pole-Annual & Master Parking Permits (25)
Silver Pole- Master Parking Permits (26)
Green Pole/Zone - Master Parking Permits with time limits (27)
Parking Destination Areas (28)
On-Street Paid Parking (29)
2021 Work Needed (30)
Sidewalk Inspections 2021 (31)
2020 Work Needed (32)
Sidewalk Inspections 2020 (33)
2019 Work Needed (34)
Sidewalk Inspections 2019 (35)
2018 Work Needed (36)
Sidewalk Inspections 2018 (37)
2017 Work Needed (38)
Sidewalk Inspections 2017 (39)
2016 Work Needed (40)
Sidewalk Inspections 2016 (41)
2015 Work Needed (42)
Sidewalk Inspections 2015 (43)
Sidewalk Inspections 2014 (44)
Sidewalk Inspections 2013 (45)
Sidewalk Inspections 2012 (46)
Sidewalk Inspections 2011 (47)
Sidewalk Inspections 2010 (48)
Address Information (49)
2022 Work Needed (51)
Sidewalk Inspections 2022 (50)
2023 Work Needed (53)
Sidewalk Inspections 2023 (52)
Recreation Related Projects (54)
Newport Harbor Segments (55)
2024 Work Needed (57)
Sidewalk Inspections 2024 (56)
2025 Work Needed (59)
Sidewalk Inspections 2025 (58)
Docks and Piers Inspected (298)
Docks and Piers Inspected All (299)
Docks and Piers Needing Repair (300)